A complete inquiry describes the lifting arrangement and procurement terms. This guide is a buyer checklist, not a load chart or an instruction to select equipment by diameter alone.

1. Define rated WLL and the lifting arrangement

State the required rated working load limit (WLL) of the complete assembly, with units, as well as load mass, centre of gravity and lifting points. Identify the hitch: vertical, basket or choker. Specify the number of legs and the intended configuration.

State sling angles in degrees relative to vertical, including the maximum planned angle. If an existing drawing measures from horizontal, label that reference explicitly and agree its interpretation before rating the assembly. WLL depends on hitch, configuration and angle relative to vertical; a component WLL or rope minimum breaking force does not establish complete assembly WLL.

2. Dimension the rope and connections

Provide nominal diameter, construction, required rope grade if applicable, core and finish. FC (fibre core) and IWRC (independent wire rope core) are buyer-specified core options to be assessed for the application; listing them does not indicate stock or suitability.

Specify ferrule-secured eyes, soft eyes or thimble eyes, eye dimensions, end fittings and single- or multi-leg assemblies. Give the effective length between bearing points with units. Reference a dimensioned bearing point drawing showing the measurement endpoints, connection interfaces and any tolerances; do not leave effective length and overall length interchangeable.

3. Specify standards and documentation

The buyer should identify the applicable standard and edition. Examples to consider where relevant are EN 13414-1 for wire rope slings, EN 12385-4 for steel wire ropes and ASME B30.9 for slings. These references are procurement inputs, not statements of product conformity.

List the inspection, marking, traceability, test records or other documents your order requires for separate confirmation. No certification or documentation availability is implied by this checklist.

4. Include the commercial RFQ inputs

Procurement information to include with the technical drawing
ItemBuyer input
QuantityNumber of assemblies, components or rope lengths, with units and a breakdown per item.
DestinationDestination port or delivery location and country; include packaging or import requirements.
Trade termsIncoterms rule, named port or place and version, for example “FCA [named place], Incoterms® 2020”. Confirm the exact location in the commercial agreement.
ScheduleRequired delivery date and any shipment constraints, for separate confirmation.
ReferencesDrawing number and revision, equipment specification and required documentation list.